Welcome, guest, you can Login or Create an account
2,45 EUR
Triangular S-curved suture needle
Triangular suture needle, double bend (S-shape), length 135 mm. The inside of the triangularly ground needle is the cutting side. These suture needles have a round eye. Non-sterile, stainless steel.
Save 25% on a set of 5!
4,50 EUR
4,95 EUR
11,95 EUR
€2,45
€42,95
€0,50
€29,95
€4,97